🏖 Build it like you mean it. Paver patios & outdoor living — Northeast Florida.

How to Vet a Paver Contractor (Before You Sign Anything)

Paver work is a trade with a low barrier to entry and a high cost of failure: anyone with a truck and a plate compactor can call themselves an installer, and the difference between right and wrong is invisible for the first year. Here’s the vetting checklist we use before referring anyone — use it on any contractor, including ours.

The non-negotiables

  1. License appropriate to the work — and verify it yourself in two minutes at the Florida DBPR license search or the county contractor licensing page. Unlicensed flatwork is common here; so are its victims.
  2. Insurance, in writing. General liability and workers’ comp certificates, sent from the insurer. A crew member hurt on your property without comp coverage can become your problem.
  3. Permits pulled by them, not you. “You can owner-permit it to save money” shifts liability to you and is the single loudest red flag in the trade (see the permit guide).
  4. Local, verifiable work. Addresses you can drive past — ideally jobs 3+ years old, because that’s when base failures surface. Any pro proud of their work has a list ready.

The questions that reveal competence

  • “What base depth and how do you compact it?” You want specifics — inches of crushed base, compacted in lifts, plate counts. Hand-waving here predicts a wavy driveway.
  • “Where does the water go?” The drainage answer (from our water guide) that separates installers from craftsmen.
  • “What edge restraint do you use?” Any confident, specific answer passes; “you don’t really need it” fails.
  • “What’s the warranty, and on what?” Settling and workmanship coverage in writing, separate from the paver manufacturer’s warranty.

Reading the quote

Good quotes itemize: excavation and haul-off, base material and depth, paver line and thickness, edge restraint, sand type, permit, and cleanup. A single number on a text message is not a quote. And a bid thousands below the pack isn’t a bargain — it’s a base you’ll pay to rebuild (the math is in the cost guide). Deposits: reasonable is 10–30% with progress payments; walking-around money up front for materials is normal, half-down-cash is not.

Or let us do this part

This checklist is exactly what we run before adding a contractor to our referral list — license, insurance, track record, and how they answer the hard questions. Tell us about your project and start from a vetted shortlist instead of a search results page.

Quote Request